Kamna's Words
Kamna uses factory floor words, and each word means one thing. Here is what each one means in the app.
Production
- Lot
- One garment production run from cutting to packing. What a buyer calls an order.
- Plan
- Where every garment lot begins: the order, the materials, the cutting week and the stages with their vendors. Save plan keeps it under Planned on Production, and Start production makes it a lot.
- Lot number
- A plain number for each factory that carries on by itself.
- Stage
- One handover of pieces or material to a vendor or to your own unit.
- Sent and received
- Sent is what left your factory. Received is what came back. Every stage has both, and Kamna never fills one from the other.
- In factory
- The pieces are with you, between stages, or cut and not yet sent to any stage.
- Ready to close
- Every stage on the lot has been received.
- Style
- The template for a lot: sizes, colours, piece requirement, target selling price and stages. A lot copies it once, when it is created.
- Fabric run
- Yarn or greige moving through knitting, dyeing and finishing until it becomes fabric in stock.
- Cutting entry
- One cutting event on a lot: which fabric, the measured quantity consumed, and the pieces cut by size and colour.
- Consumption
- What was measured at cutting. Never what a style says should be needed.
Stock
- Yarn, fabric and trim number
- The reference of a stock receipt. It carries on by itself when the box is left blank.
- Trims
- Labels, thread, buttons, elastic, polybags, zippers and the like.
- Stock check
- Weighing or counting what is on the shelf, entered beside Kamna's own figure so the difference is recorded.
- Dead stock
- Material marked as no longer usable. It stays in stock value.
- Blocked and free
- Blocked stock is held for a plan or a lot. Free stock is the rest. A block takes nothing out of stock and never changes its value.
- Purchase request
- A request to one supplier for fabric or trims that a plan is short of. It carries quantities only, never a price, and Kamna never calls it a purchase order.
Money
- Bill basis
- What a vendor billed on: the pieces sent or the pieces received.
- Wastage tolerance
- Your own percentage added to fabric cost at costing.
- First quality, seconds, rejected
- The three piece counts entered when a lot closes. Cost per piece divides by first quality.
- Raw cost and final cost
- Raw cost per piece is total cost over first quality pieces. Final cost adds your overhead percentage. Both are frozen at close.
- Findings
- Money matters Kamna spots in your entries, shown with the evidence behind each.
People
- Owner and staff
- The two roles. The owner sees money. Staff enter everything and never see a money figure Kamna works out.
- Vendor and supplier
- A vendor does work on your material. A supplier sells you material.
- Reports PIN
- A 4 to 6 digit code the owner sets. Staff enter it to open Home. It never opens money.
- Other
- The choice for anything not on a list: a stage, a construction, a trim, a category or a cost you name yourself.