Closing a Lot and Cost per Piece

How to close a lot, and how Kamna works out cost per piece from what the lot used.

How do I close a lot?

When every stage has been received, the lot reads Ready to close. Tap Close lot and enter the close date and the first quality, seconds and rejected pieces.

  • The Rejected box starts blank. Beside it the sheet shows how many pieces the stages rejected in all, and under it each stage's rejects, so you count the lot's own rejects with that figure in view.
  • Output cannot be more than the pieces cut.
  • A close date more than a day ahead is refused.
  • A lot with sizes closes on approved pieces by size, and their total is first quality.
  • A lot cut in more than one colour also lists approved pieces by colour. On a lot with sizes, the colours must add up to the size total before Close lot opens.
  • The pieces boxes start empty. A split you planned shows in grey inside the box, and only what you type counts.
  • Closing needs an internet connection.

How does Kamna work out cost per piece?

Cost per piece in Kamna is everything the lot used, divided by its first quality pieces. The cost summary adds these parts:

  • Fabric: the quantity consumed at cutting times the fabric's rate, plus your wastage tolerance.
  • Additional fabric: fabric sent with a stage or added to it later, at the fabric's own rate with no tolerance on top.
  • End bits: the end bits weighed at cutting, at the fabric's own rate with no tolerance on top.
  • Cutting: the cutting payouts.
  • Making: the bills on the lot's stages.
  • Trims: the trims issued to its stages.
  • Additional costs: anything you added under Other costs, such as testing or transport.
  • Samples: the samples the lot came from, each at its sampling cost plus its material at stock rate (see samples).

That total over first quality pieces is the raw cost per piece. Your overhead percentage on top gives the final cost per piece. Margin compares the final cost with the target selling price.

Where do I set wastage tolerance and overhead?

You set both on the Factory screen in Admin, under Costing. Kamna never sets them for you.

The fabric variance tolerance is your wastage percentage added to fabric cost. The overhead percentage is added to the raw cost per piece.

What is fixed when a lot closes?

At close, the raw cost per piece, the overhead percentage and the final cost per piece are frozen on the lot.

Its pieces pass to your store, each size and colour counted and costed. The close date can be edited later, and a closed lot can be reopened.

How do I see plan against actual when a lot closes?

A closed lot that started from a plan shows Plan against actual on its detail: one table with the plan beside what happened.

  • Pieces: first quality against the order quantity, by size, and by colour when there are several.
  • Materials: each planned material used against planned, its share a piece, and any purchase request closed short. Woven fabric reads pieces a metre, and fewer than planned counts against.
  • Making: when each stage came back against its planned date, the vendor when it changed, and stages added on the lot as unplanned.
  • Dates: the first cutting against the planned week, and the close against the delivery date.
  • Money, owner only: the planned other costs, the cost a piece against the target cost, and the margin at the target price against the planned margin.

Nothing in the table is typed. It is all worked out from what was entered, and an actual figure shows in red only where it counts against the plan. Staff see the same table without any money.

How do I add a cost such as testing or transport?

On the lot, tap Add cost and enter what it is for, the amount, and a note such as the bill number.

A cost can be pattern making, testing, photoshoot, transport, checking, or Other with a type you name. A lot's sampling arrives through the samples linked to it; a factory that does not record samples types Sampling under Other. Removing a cost takes its amount off the lot. On a lot that started from a plan, the planned amount for that kind shows in grey. It is a reminder, never a saved figure.

Who can see costs and margin?

Only the owner. Every figure on the cost summary is owner only, and every amount shows in the factory's own currency, set on the Factory screen.

Staff see the pieces and the stages, and they type rates and bills, but they never see what those add up to. See owners and staff.